Overview
To comply with CDE’s June 2025 SUN Bucks guidance, this plan
outlines procedures for three rounds of verification, each involving a random
3% sample of UBA-based eligibility determinations.
Verification Round
|
Timeframe
|
Sample Size Target
|
Sample Pool
|
Round 1
|
June 17–21, 2025
|
3%
|
UBAs processed by June 15
|
Round 2
|
July 22–26, 2025
|
3%
|
UBAs processed by July 20
|
Round 3
|
Aug 26–30, 2025
|
3%
|
All remaining UBAs by Aug 25
|
Sampling Method
- Random Selection using Excel/Google Sheets random number generator
or data system query.
- Maintain a record of sample methodology for each round.
- Exclude UBAs previously selected in earlier rounds to avoid duplication.
Verification Process (per UBA sample)
1. Initial Admin Match (Direct Verification): Attempt to
verify categorical eligibility via CalFresh, Medi-Cal, CalWORKs, foster, or
homeless program data.
2. If Admin Match Fails: Send Verification Request Letter with deadline for
families to submit income documentation (10 calendar days).
3. Follow-Up & Determination: Review submitted docs. Send Adverse Action
Notice with appeal rights if eligibility changes.
4. Document Outcomes: Log results and prepare EDCS upload. Securely store all
documentation.
Required Documentation (per UBA)
- Original UBA form
- Proof of eligibility (income/docs)
- Verification letter sent
- Family response or no response
- Final determination record
- Adverse action & appeal info (if applicable)
EDCS Reporting
Upload all verification outcomes (verified, no response,
denied, reduced) by September 15, 2025. Ensure all fields align with EDCS
Verification Submission Template.
Internal Audit Checklist
- [ ] 3% sample selected per round
- [ ] Randomization method documented
- [ ] Verification process applied to each selected case
- [ ] Timely family communication issued
- [ ] All outcomes clearly recorded and archived
- [ ] Results uploaded to EDCS
Timeline Summary
Task
|
Date Range
|
Owner
|
Round 1 Sample + Verify
|
June 17–21
|
Eligibility Team
|
Round 2 Sample + Verify
|
July 22–26
|
Eligibility Team
|
Round 3 Sample + Verify
|
August 26–30
|
Eligibility Team
|
Final EDCS Upload
|
By September 15
|
Program Coordinator
|
Internal Audit + File Storage
|
Through October
|
Data Compliance Lead
|
- CDE SUN Bucks Help Desk: sunsupport@cde.ca.gov
- EDCS Support: edcsupport@cde.ca.gov